
Project completed by staff prior to FINLEY The crossing is 3.186 miles (5.127 km) long, consisting of a single central navigation span over the “Shoots” channel and approach viaducts on either side. The 37 bridge pier foundations on the approach …

The $802M I-395/SR836/I-95 Design Build Project is a partnership between the Florida Department of Transportation (FDOT) and the Miami-Dade Expressway Authority (MDX) that includes three separate projects being constructed simultaneously. Included in these three projects are major improvements to a …