Second Severn Crossing. United Kingdom

Project completed by staff prior to FINLEY The crossing is 3.186 miles (5.127 km) long, consisting of a single central navigation span over the “Shoots” channel and approach viaducts on either side.  The 37 bridge pier foundations on the approach …

Brotonne Bridge. France

Project completed by staff prior to FINLEY This concrete cable-stayed bridge (724m long, Main span: 320m) was completed in 1977. The bridge utilizes approaches built using the balanced cantilever erection method and form travelers on both sides.  Construction of the …

Natchez Trace Route 96. Franklin, Tennessee

Project completed by staff prior to FINLEY. This project completes one of the final legs of the scenic Natchez Trace Parkway near Nashville, Tennessee.  The bridge consists of two arches; spanning 582-ft. and 462-ft. These arches, along with intermediate piers, …

Capital Cascades Crossing Pedestrian Bridge

The $7.2M new Capital Cascades Crossing Pedestrian Bridge spans over Tallahassee Florida’s bustling South Monroe Street connecting Cascades Park with the Capital Cascades Trail. As the first solar powered pedestrian bridge in the world, the structure provides a safeguard for …

I-395/SR 836/I-95 Design-Build Project

The $802M I-395/SR836/I-95 Design Build Project is a partnership between the Florida Department of Transportation (FDOT) and the Miami-Dade Expressway Authority (MDX) that includes three separate projects being constructed simultaneously. Included in these three projects are major improvements to a …

1 2 3 4 5 8