On the afternoon of January 21, 2011 a fatal accident badly damaged the SR 528 overpass. FDOT inspected the damage in order to determine the extent to which the side-by-side bridges’ structural integrity had been compromised when a tanker truck …
The SR 79 Bridge is a high-level bridge, spanning the Intracoastal Waterway at West Bay near Panama City, Florida. The new bridge adds two additional lanes of traffic to SR 79, providing access to Florida’s Panhandle beaches and an emergency …
In the early hours of June 27, 2012 FINLEY received the call and was on-site within hours for an emergency bridge repair on U.S. 301 and U.S. 90 after Tropical Storm Debby washed away the bridge. FINLEY provided bridge design …
This $66 million design-build project creates a new flyover bridge from the southbound San Gabriel River Freeway (I-605) to the eastbound San Bernardino Freeway (I-10) in order to improve traffic flow and reduce delays caused by merging traffic. This 18 span, 3364 …
The $135M I-4 (SR 400) project consisted of widening 14 miles to 6 lanes from East of SR 44 to West of I-95 and reconfiguration of I-4 and the SR 92 Interchange to improve safety and relieve congestion. The existing …
The A. Max Brewer Bridge Design-Build project connects the City of Titusville to Merritt Island providing access to the Kennedy Space Center via SR406. The aging and structurally deficient bridge needed to be replaced. The original swing bridge regularly delayed …
The Wellesley (Cedar Street) Bridge replacement project is a $4.1 million “Heavy Lift, Accelerated Bridge project”, according to the Massachusetts Department of Transportation. It was designed to replace the superstructure and center pier of the Cedar Street Bridge over Route …
When the City of Louisville, Kentucky was given the abandoned Big Four Railroad Bridge over the Ohio River, it saw this as an opportunity to build a new pedestrian bridge over the Ohio River that would provide a centerpiece to …
I-35 is a major north/south transportation artery in Texas used by locals, business travelers, and trucks carrying goods. The Texas Department of Transportation (TxDOT), City of Waco, and Baylor University wanted a signature bridge to match their local economic revitalization …
The 76 year-old, structurally-deficient drawbridge needed to be replaced to improve the efficiency and operation of the bridge for vehicle traffic and to allow for smoother safe passage of fuel barges, which supply 60% of the region’s residential heating fuel …