The Demolition of Two Precast Segmental Bridge’s
Presented By: Jerry Pfuntner, P.E., S.E., P.Eng
View Full Presentation (.pdf)
Designing and Detailing for FL DOT’s Flexible Filler Post-Tensioning Specification – Wekiva Section 6 Project – Orlando, FL
Presented By: Jerry Pfuntner, P.E., S.E., P.Eng
View Full Presentation (.pdf)
The Design and Construction of Bridge 303 (Precast Segmental) – Israel
Presented By: Jindrich Potucek, P.E.
View Full Presentation (.pdf)
Pros, Cons and Characteristics of Precast Segmental Transit Bridge. Boxes vs. Channel Cross Sections.
Presented By: Carmine Borea, P.E.
View Full Presentation (.pdf)
Prescribing Architectural Merit in Segmental Bridges
Presented By: Maxim D. Nasab, AIA, NCARB
View Full Presentation (.pdf)